King’s Somborne Neighbourhood Development Plan Summary
Further to a two-year programme of activity, which involved 18 public meetings/workshops, 41 public meetings of the NDP Steering Group, monthly updates in both the Parish Council Meetings and Parish Magazine The Gauntlet during the Period as well as leaflet drops, in 2018 King’s Somborne’s first draft plan was published for consultation. This draft plan, appendices and public feedback can be found below. Since this time, using the 20018 draft NDP as a springboard, significant work has taken place to move the NDP forward. (These updates can be found on the tab entitled “New NDP – Updates: Work in Progress”).
If you would like to read the original 2018 draft NDP, it is available for download here, in a zip file for you to read offline
You can download the complete plan plus appendices from here
Or read it in full online here, use your mouse wheel or the Up and Down buttons to move to another page, or the Plus and Minus buttons to zoom in and out of the NDP pages.
King’s Somborne Neighbourhood Development Plan Appendices
- NDP Feedback documents – redacted from Parishioners.
- 1.0 LANDSCAPE AND ENVIRONMENT
- 2.6 KSPC NDP SURVEY
- 2.2 DESIGN GUIDANCE
- 3.0 FACILITIES AND INFRASTRUCTURE
- 2.7 HOUSING NEEDS SURVEY
- 2.5 LANDSCAPE ASSESSMENT REPORT
- 2.4 SITE ASSESSMENTS
- 2.3 MODEL COVENANTS
- 2.1 HOUSING NUMBERS
- 2.0 HOUSING REQUIREMENT
- 1.2 GREEN SPACE
- 1.1 PARISH PROFILE
King’s Somborne Neighbourhood Development Plan Additional Material for the LANDSCAPE AND ENVIRONMENT
- 1.0.3 Archaeology Maps
- 1.0.6 Kings Somborne Conservation Area Policy dated 1987
- 1.0.2 Archaeology and Historic Buildings Record
- 1.0.1 Hampshire Biodiversity Information Centre Information
- 1.0.5 Historic Building Maps
- 1.0.4 John O’Gaunt Deer Park Map
- 1.0.7 List of Indigenous Trees
King’s Somborne Neighbourhood Development Plan Additional Material for the SITE ASSESSMENTS
- 2.4.1 Inital Brownfields Site Search within KS Parish Boundary (July 2016)
- 2.4.7 Flood-Risk-Assessment-Sequential Test
- 2.4.3 Northern Test Valley Rural Sites Submitted for the SHLAA
- 2.4.6 Site Access Study
- 2.4.4 Blank Site Assessment Form
- 2.4.9 NDP Site Allocation Scoring
- 2.4.5 Completed Site Assessment Forms (combined)
- 2.4.2 Potential Sites (June 2017)
- 2.4.8 Neighbourhood Development Plans Undertaking site selection (Traffic light method)
- 2.4.5 Completed Site Assessment Forms
King’s Somborne Neighbourhood Development Plan Additional Material for the KSPC NDP SURVEY
The Consultation Period
The consultation period ran for 6 weeks from 10th May and closed at midnight on 22nd June and members of the public and other interested parties were able to review the Plan and make comments/provide feedback which were then be taken on board before submitting the final Plan to Test Valley Borough Council.